THE PLEASURE HOME
  • Overview
  • Portfolio
  • The Process
  • First Fix
  • Control
  • New Tech
  • Contact Us
  • Overview
  • Portfolio
  • The Process
  • First Fix
  • Control
  • New Tech
  • Contact Us

A FUTURE-PROOF INFRASTRUCTURE

Please do not under-estimate the importance of installing the OPTIMUM IT, AV & WiFi WIRING INFRASTRUCTURE at an EARLY STAGE IN YOUR PROJECT, typically known as "FIRST FIX", either for your own Property, or if you are a Property Developer building a development of Flats or Houses. The correct Infrastructure design should not only protect you against future technology changes but also the cost of its installation should be fully recoverable when you come to sell the Property.  8K TV and high speed HARD WIRED connectivity will still be a defacto requirement for both system STABILITY and SECURITY over the next decade, despite all the hype about wireless technology ...
​
The Pleasure Home provides a unique "FIRST FIX INFRASTRUCTURE SERVICE" consisting of:
  • "Future-Proof" ​Infrastructure Design
  • Layout Drawings and Wiring Schemas for your Electricians
  • Termination, Testing & Certification of all AV/IT Cabling
  • Optional Project Management of your Electricians to run these cables and thereby minimise labour costs

​This service starts at only £360+VAT for the Infrastructure Design and initial Consultancy.
Picture
Flexibility, Future Proofing and
​Project Documentation are vital!
Picture
Hidden, but powerful WiFi


Picture

Structured Cabling

Structured cabling combines all the required cables within a single protected sheath.  The result is reduced installation labour costs and a much lower chance of damaged cabling when routing the cables through the building.
Picture

Quality Terminations

As speeds and TV resolutions increase, even if the best quality cabling is used, the performance and consistency of connections live and die on Professional Engineers performing high quality terminations at both ends of every cable.
Picture

Full Documentation

The Pleasure Home is rigorous on its need to document every aspect of the Project.  This is not only for fault finding, but also to minimise costs when it comes to the inevitable need to upgrade or enhance the system at a later date.

CLICK HERE for
​more Information
CONTACT US FOR A SITE VISIT/QUOTE